Crescent Manor Condominium Association, Inc.

Project Description: Early in May of 2016, Crescent Manor Condominium contracted Pipelining Technologies, Inc. to structurally line approximately 45 linear feet of 4" horizontal branch lining from unit #102/103 bathroom to the existing cleanout. Board President, John Gunter said of his experience with Pipelining Technologies: "We were pleased with the knowledge and the positive and [...]

2016-11-29T13:10:32-05:00

Pipelining for Carlton Terrace North

Project Description: On March 3rd 2014, Pipelining Technologies began working at Carlton Terrace North Condominiums, Ft. Lauderdale, Florida in order to rehabilitate the East Building's piping system. One hundred and thirty  (130') linear feet of 4" horizontal cast iron piping were lined underneath the building. Now that Carlton Terrace North has a fresh plumbing system [...]

2016-11-29T13:10:33-05:00

Grove Isle Coconut Grove Condominiums

Project Description: Grove Isle Condominiums are located on a private, self contained Island in Coconut Grove (Miami), Florida. The three 18 story buildings house 500+ exclusive condominium units with underground parking, a tennis club, and access to a private marina. Pipelining Technologies was originally called in June 2007 to deal with specific problems related to [...]

2016-11-29T13:10:33-05:00

Southern Gardens Facility

Project Description: The Southern Gardens Orange Juice facility is a processing plant that frequently runs 24 hours a day during the harvest season. PTI was called in on two occasions during the 2006 and 2007 harvest seasons to deal with leaks in the 10 inch onsite underground process water drainage system. The pipe is 14 [...]

2016-11-29T13:10:33-05:00

Bon Bini Condominiums

Project Description: On the coast of the 5th oldest city in South Florida, Bon Bini Condominiums was experiencing pipe failure like many other condominiums of the same age. The problems included sewage backing up into 1st floor units, and sewer gas seeping into 2nd floor living quarters. In order to fix this problem Bon Bini's [...]

2016-11-29T13:10:33-05:00

Kennedy Space Center

Project Description: In the summer of 2007, Pipelining Technologies was contacted to assist in troubleshooting the rainwater drainage leaks in the 40+ year old NASA Operations and Control Facility. This facility is the center for NASA’s manned flight operations and also houses related contractor component assembly areas. Pipelining Technologies was instrumental in video inspecting and [...]

2016-11-29T13:10:33-05:00

April Song Condominium

Project Description: Pipelining Technologies was hired by April Song Condominium Association of Hallandale, Florida in March of 2014. The scope of work included: Video inspect to diagnose nature of plumbing issues Structurally line approximately 200 ft of underground sanitary cast iron pipe Robotically reinstate approximately 20 branch lines Final video inspection for presentation to board [...]

2016-11-29T13:10:33-05:00

Bayview Village Condominium

Project Description: Pipelining Technologies was hired by Bayview Village Condominium Association of Fort Lauderdale in April of 2015. The scope of work included: Video inspect to diagnose nature of plumbing issues Structurally line approximately 42 ft of underground sanitary cast iron pipe Robotically reinstate approximately 2 branch lines Final video inspection for presentation to board [...]