Project Description

Project Description:

In the summer of 2007, Pipelining Technologies was contacted to assist in troubleshooting the rainwater drainage leaks in the 40+ year old NASA Operations and Control Facility. This facility is the center for NASA’s manned flight operations and also houses related contractor component assembly areas. Pipelining Technologies was instrumental in video inspecting and writing the engineer’s specifications for lining the rainwater drainage system with our structural drainage lining system. Lining work was completed by the summer of 2008 with our structural lining process.

Project Details:

  • Kennedy Space Center
  • Kennedy Space Center
  • Kennedy Space Center

Location:

Central Florida