San Remo Condominiums Contracts with Pipelining Technologies, Inc.

Pipelining Technologies, Inc. was contracted in January of 2016 to clean and structurally line an abounding 10,000 linear feet of cast iron drainage pipes. This is a substantial project for Pipelining Technologies, keeping an entire crew busy for the better part of a year. Working at San Remo has been a beautifully orchestrated effort between San Remo Property Manager, Kim Exteen and PTI’s management and hard-working field technicians.

The scope of work  below applies to all 6 buildings. All of the vertical stacks and horizontal underground lines in each building are to be rehabilitated.

The Scope of Work includes:

  • Pre-video inspection of the pipes to be lined
  • Thorough cleaning of the pipes’ interiors
  • Structural lining of all vertical stacks and underground lines
  • Post-video inspection of each newly lined pipe

San Remo Condo AerialAbout The Community

San Remo is a Boca Raton, Florida Community of Ocean Front Condominiums consisting of 6 Buildings which are named:

  • Villa Raphael
  • Villa Verona
  • Villa Milano
  • Villa Flora
  • Villa Diano
  • Villa Capri

The Board at San Remo opted for the use of trenchless pipe lining for their repair method in order to save on costs all the while receiving a better end product than new cast iron with minimal destruction to surroundings.

San Remo Pipelining TrailerWould you like to see the pipe lining process in person?

Pipelining Technologies, Inc. will be working at San Remo Condominiums in Boca Raton, FL until approximately the Spring of 2017. If you are a Board Member or Property Manager, contact us to arrange a tour of one of our current projects such as San Remo, and see the pipelining process in action.